Search

Hongke's latest articles

HongKe

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

HONGKE Solution] New Energy Centralized Charging Station Failure, Slow Operation and Maintenance, TELE NA003 Grid Protection Relay to Break the Situation

In recent years, the number of new energy vehicles has continued to grow at a steady rate. Annual growth rate of 30%+Demand for charging is surging in tandem with the rise in demand. With the rapid rollout of large-scale charging infrastructure, the "How to ensure the safe and stable operation of charging stations"andHow to Reduce Operation and Maintenance Costs and Increase EfficiencyThe "charging" has become a core issue for charging operators.

A new centralized charging station, configured by a regional operator:

  • 80 Fast charging piles 180 kW
  • 20 60 kW slow charging piles
  • Total capacity of 15.6 MW
  • Can serve 350+ vehicles per day

Such a high-density, high-power configuration allows the station to be Power Quality, Protection Response Speed, Remote Visualization Management We are facing a great challenge in this regard.

01 Typical Maintenance Pain Points of Centralized Charging Stations

In actual operation, the centralized charging station has revealed a number of technical bottlenecks:

1. Frequent breakdowns in the morning and evening peaks, and scene characteristics that exacerbate risks

  • Daily 7-9pm, 17-19pm Fast charging pile running at full capacity
  • Voltage fluctuation up to ±15%
  • Instantaneous overcurrent 3-5 times per day
  • When multiple piles are activated together, the voltage in the station will drop to as low as 185 V
  • part of the circuit Harmonic distortion rate close to 8%

The above conditions can interfere with other equipment in the station and cause stability risks in the communication and power modules.

2. Traditional protection is lagging behind, and the risk of security transmission is rapid.

  • Average response of conventional protection devices >200 ms
  • Convenience Missed cuts, miscutsThe damage has been caused by a number of fast-charging piles.
  • The risk is more serious when the following conditions are not removed in time:
    • Current exceeds rating 1.5 times
    • Voltage exceeds rating 1.2 times

The worst case scenario can lead to power module damage, insulation breakdown, and possibly even toVehicle BatteryThis has led to significant safety hazards.

3. Inadequate remote management and high cost of manual inspections

  • Unable to access SCADA
  • Faults require manual on-site troubleshooting, average handling time >4 hours
  • Lack of existing protective devices Remote alarm and real-time recording
  • Labor costs as a percentage of operating expenses 20-25%

In order to solve the above problems, the project owner needs a set ofFast response, accurate protection, remote managementThe "Intelligent Electrical Protection Program.

02 Hongke TELE Solution: TELE NA003 Precision Deployment

In view of the high power characteristics and operation and maintenance requirements of centralized charging stations, the project team finally selected HONGKE TELE NA003 Grid and System Protection RelayIt also provides a layered deployment and parameter optimization to realize the protection strategy and visual monitoring of the whole link.

1. Regional coverage deployment

exist 10 kV feeder main cabinetand distribution boxes in each district NA003 → Realization Total → Divisions → Returns Full Chain Protection.

2. Multi-parameter monitoring and threshold customizable

Monitor voltage 0-560 V, frequency 40-65 Hz, RoCoF, phase deviation, and support forCustomized Trip Threshold,The delayed start time can be set.

3. millisecond fast response

NA003 Ownership Millisecond cutoff capabilityIt is very suitable for fast charging pile high transient scenarios, can quickly isolate the fault to avoid collateral damage.

4. Supports remote communication for seamless access to SCADA.

  • support sth. Modbus-RTU/RS-485
  • Failure alarm, automatic reporting
  • Remote viewing of status signals and contact outputs
  • Supports remote monitoring and automation of station-wide operation and maintenance

5. easy to operate and adjust

  • LCD Display
  • Menu Key Setting
  • Supports parameter recovery and seal protection
  • On-site installation and commissioning is more intuitive and efficient.

With this setup, HONGKE TELE NA003 not only provides "millisecond fast protection", but also incorporates the protection data of the whole station. Remote Maintenance SystemIn addition, the management of charging stations has become more intelligent and transparent.

03 TELE NA003-M64: A Powerful Addition to New Energy Protection

Hongke TELE NA003-M64 Designed for distributed power grid protection with:

  • Voltage, Frequency, Phase Sequence, Phase Angle Monitoring
  • Anti-Occidental Island Protection
  • Suitable for 230V/400V power grids

In the event of a power supply interruption or energy supplier failure, it can be used in Milliseconds Cut the circuit to ensure the safety of small power generating equipment and personnel.

Key Features:

  • Real-time single/three-phase voltage monitoring
  • Support FRT (Fault Ride Through)
  • 1-2 sets of coupling switches to ensure physical isolation

04 Project Effectiveness: Improved Security, Increased Availability, and Significantly Reduced Operation and Maintenance Costs

After three months of actual operation, HONGKE TELE NA003 has brought significant results:

After the centralized charging station has been in operation for three months, the effect of HONGKE's TELE NA003 deployment is very obvious. First of all, the overall downtime has decreased by more than 40% compared to the initial period of operation, and the overall availability of charging stations has increased from about 95% to nearly 99%, which has greatly enhanced the service capacity and operational stability of the stations. Secondly, during high load periods such as morning and evening peaks, the service capacity of a single station has been increased by 20 to 30 units, enabling the charging station to maintain a more stable power supply quality and operational efficiency in the face of rapid changes in load.

At the same time, since NA003 supports Modbus real-time data upload and seamless access to SCADA system, operation and maintenance personnel can remotely locate abnormalities and significantly shorten the troubleshooting time, which reduces the frequency of inspection by about 30%, significantly increases the number of stations managed by a single person, and improves the overall efficiency of operation and maintenance.

In addition, the project team estimated that the charging stations could reduce maintenance and downtime losses by about $400,000 to $500,000 per year, mainly due to the reduction in the number of equipment breakdowns, downtime and labor costs. Overall, HONGKE TELE NA003 not only improves operational safety, but also brings quantifiable economic benefits to the stations.

Other Articles

可配置的CAN FD模擬I/O模塊 功能概述: PCAN-MicroMod FD系列模塊是支持CAN FD的數采模塊。 PCAN-MicroMod FD 插入式板卡可以和即插即用的母板一起購買,母板提供了各種外設可滿足特定需要。對於CAN連接、I/O、和供電,可用彈簧端子連接器。 PCAN-MicroMod FD 數字版1和2著重於數字輸入和輸出,其上有相應的保護電路。數字1的數字輸出裝備了低邊開關,數字2的裝備了高邊開關。
Hongke Dry Goods

[Hongke Solutions] Can’t Read CAN Data? Not Enough Temperature Channels? A Comprehensive Guide to Integrating NVH and Battery Data Acquisition

Is your current NVH data logger unable to read the CAN bus? Are there not enough temperature channels for battery testing? Hongke offers the PCAN-MicroMod FD and MU-Thermocouple1 CAN FD modules to enable CAN(FD)-to-analog conversion and high-density thermocouple multi-module cascading expansion. No coding required—just unbox and use it right away, with no need to replace your existing system!

Read more
Hongke Dry Goods

[Hongke Solutions] AI Agent Implementation Case Study: Enterprise-Level Deployment Across Six Major Industries and the Logic Behind the Underlying Infrastructure

An in-depth analysis of how enterprises can transition from single LLM API calls to autonomous agentic systems. This article compiles real-world examples of AI agent deployments in production environments across six major industries, including retail and finance, and breaks down the underlying infrastructure logic—such as high concurrency, cross-interaction memory (Memory Infrastructure), and distributed state persistence.

Read more
Hongke Dry Goods

HONGKE SOLUTIONS] The Effect of Gaussian Noise on Positioning Effect in GNSS Simulation

In Global Navigation Satellite System (GNSS) radio frequency simulation testing, Gaussian white noise (AWGN) is typically regarded as the baseline configuration for replicating real-world electromagnetic environments. However, engineering practice has shown that the impact of noise on a receiver’s positioning performance does not follow a linear, monotonic relationship. Based on actual measurement data from the DST GNSS simulator, this paper analyzes the physical mechanisms of Gaussian noise in Kalman filters, correlator jitter, and phase-locked loops, and provides a scientific testing guide for configuring simulation noise.

Read more

Contact Hongke to help you solve your problems.

Let's have a chat